CLEANING AND DIGGING MACHINE SZP-750
SZP 750 is a track machine, self-moving in working mode, specificcaly designed to carry out groundwork in proximity to the rack.

The machine SZP 750 serves for earthwork which has to be done for maintenance and reneway of railwai bed . It is determined first of all for:

■ Cleaning and renewal of ditchies , digging drainage channels
■ Laying of the cabels within reach of the bucket wheel
■ Earthwork connected with railway bed maintenance
■ Slopes arrangement along the railway line
■ Excavating of new drainage channels

Machine is designed for special railway track works with different type of rails, conections and sleepers in moderate climatic conditions with ambient temperature in the range of minus -10 °С – plus 40°С.

DESCRTIPTION OF MAIN PARTS OF SZP – 750

Bogie frame It is welding construction made from steel plates and standard section. The Frame is located at two bogies, tapered off in middle part, for working of bucket wheel excavator just behind end of sleepers. The frame is equipped at both sides by automatc connections SA-3 with dumping device.

Power unit
The machine is equipped with one diesel engine CATERPILLAR C15 with output 403 kW.

Bucket wheel excavator
It is designed for cleaning ,renewal of ditchies and drainage channels and digging new ditchies. Bucket wheel excavator is assembled on special mechanism, for turning of wheel to vertical and also horizontal axle of machine frame. Wheel is equipped with coveyer and counterweights. Hydraulic drive of wheel – by gear unit and hydraulic motor. Excavated material goes through hopper to turning conveyer, which enable discharge of excavated material into wagon of train set or next to the railway for one or other side.

Ploughts:
The machine is equpped with two trussed ploughts one of each side. Which are designed for auxiliary works of planation and arragment of slopes along the railway line. The plug consist of arm, turning head, ploughshare and arm of plought jib. Turn of ploughshare can be set in both vertical and horizontal plane. Plought is mounted to the machine franme by turning and lifting mechanism. In transfer mode the ploughts are lifted and bedded on special brackets.


SZP-750-1.JPG SZP-750-10.JPG SZP-750-11.JPG SZP-750-12.JPG SZP-750-13.JPG SZP-750-14.JPG SZP-750-17.jpg SZP-750-2.JPG SZP-750-3.JPG SZP-750-4.JPG SZP-750-5.JPG SZP-750-6.JPG SZP-750-7.JPG SZP-750-8.JPG SZP-750-9.JPG SZP-750.jpg

sipka Basic technical data

track gauge 1 435 mm (1 520 mm)
wheelbase 16 000 mm
lenght across buflers 23 400 mm
machine self-weight 100 000 kg
speed limit with own drive 80 km.h-1
speed limit in train set 100 km.h-1
min. track curve radius 150 m
extraction unit capacity 120 - 400 m3.h-1
max. side reach of bucket wheel 7 800 mm
dig depth of bucket wheel 2 800 mm
max. side reach of plough 6 000 mm
depth of plough reach 1 200 mm